Gas range series
Open-burner and solid-top ranges with optional oven bases, in four- and six-burner formats for à la carte service.
Commercial cooking equipment is the hot-line hardware that prepares food at service volume — ranges, griddles, fryers, boiling pans, salamanders and the stands that tie them into one line. Cooking ranges, fryers, griddles, fast-food and warming equipment for high-volume professional kitchens, configured for gas or electric supply by destination market.
Applicable buyers: Restaurant chains, hotels, central kitchens
CE and UKCA are the conformity schemes commonly referenced for EU/UK projects. This is a requirement note, not a statement that a certificate is held; copies and model scope are provided on request.
The hot line sets the pace of the whole kitchen. We specify it around your menu, peak covers, available gas or electrical load and the extraction capacity above it.
The model list is to be confirmed. These are the configuration families buyers most often request; send your required capacity and we will match them to current models.
Open-burner and solid-top ranges with optional oven bases, in four- and six-burner formats for à la carte service.
For kitchens with limited gas supply or tight ventilation budgets; fast heat-up and precise zone control.
Single and twin-tank fryers, flat and grooved griddles matched to breakfast, grill and fast-service menus.
Jacketed kettles and boiling pans for sauces, soups and bulk batch cooking in central kitchens.
Values below are typical configuration ranges for the category, not a verified model specification.
| Parameter | Value / configuration |
|---|---|
| Installation format | Free-standing, countertop or modular suite with matching heights |
| Energy supply | Natural gas, LPG or electric; single-phase and three-phase builds |
| Supply voltage | 220–240V / 50Hz (EU/UK/SEA); 110–120V / 60Hz (North America); 380–415V three-phase options |
| Gas connection | Configured to the destination standard; CE gas directive or ANSI/CSA references as applicable |
| Structure material | 201 stainless steel |
| Burner / zone control | Individual controls; flame-failure protection fitted on gas builds |
| Duty cycle | Continuous commercial service, not domestic intermittent use |
| Compliance documentation | CE / UKCA (EU/UK), ETL / UL / NSF (North America) — verified copies on request |
| Verified model values | To be confirmed — supplied in the official spec sheet |
Typical configuration ranges only. Model-specific verified values, dimensions and certificate numbers are supplied in the official spec sheet on request.
Compliance requirements differ by destination. Confirm them before the quotation so the build, documents and price are correct the first time.
CE and UKCA documentation, 220–240V / 50Hz supply, and gas builds aligned with the applicable gas appliance regulation. Ask for the certificate copy covering the exact model.
ETL / UL / NSF references as applicable, 110–120V / 60Hz or three-phase supply, and ANSI/CSA gas considerations. Confirm the inspection authority for your state or province.
LPG-dominant gas configuration, 220–240V / 50Hz with three-phase options, and high-heat-duty builds. Confirm local import and gas-installation requirements early.
Send your capacity, voltage, gas or refrigerant requirement and destination port. We will return matched models, compliance notes and a quotation.
Short, direct answers for buyers shortlisting this category.
Choose gas for high-heat wok and open-flame work; choose electric or induction where gas supply, ventilation or heat load is constrained. We confirm the choice against your menu, available utilities and extraction design before quoting.
It depends on the destination. EU/UK and most Southeast Asian projects use 220–240V / 50Hz; North American projects use 110–120V / 60Hz or three-phase. State the country in the inquiry so we quote the correct build.
Yes. Send the kitchen dimensions and menu and we will assemble a matched line — ranges, fryers, griddles, worktables and extraction — with consistent heights, utilities and a single delivery schedule.